A Groundwork company - serving Berkeley, CA
A remodeled primary bathroom with a soaking tub and a walk-in shower

Vanities, Tile & Fixtures in Berkeley, CA

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Berkeley
A remodeled hall bathroom with patterned floor tile and painted walls
A wood double vanity with two mirrors after a bathroom remodel
A remodeled primary bathroom with a soaking tub and walk-in shower
A newly finished roof with a ridge vent and step flashing
A new front entry door with glass sidelights
A new black aluminum pool fence with a gate
A new curved paver walkway to the front porch
A galley kitchen opened up to the dining room with a new peninsula
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Vanities, Tile & Fixtures in Berkeley, CA

Vanities, tile, and fixtures are the three elements that decide whether a bathroom feels finished or half-done. A new vanity sets the storage and sink layout, tile handles the waterproofing and the look underfoot and on the walls, and fixtures (faucets, shower valves, drains, lighting) are what you actually touch every morning. Groundwork Construction Co. of Berkeley installs all three as one coordinated job, so the vanity fits the plumbing rough-in, the tile lines up with the cabinet, and the fixtures match instead of clashing. If a bathroom of yours needs any of this work, call (855) 471-4163 for a free estimate and a straight number.

This is a sub-service of our Bathroom Remodeling in Berkeley, and it’s one of the most requested upgrades we get. Plenty of Berkeley homes still have the original 1950s tile, a vanity that’s swollen from years of steam, or a shower valve that no longer holds temperature. Replacing all three at once is cheaper than doing it piecemeal, because the walls are open once and the trades don’t have to come back three separate times.

Our technicians have up to 12 years of experience with tile setting, cabinet fitting, and fixture installation. Every project is covered by the 730-Day Done Right Promise: if it’s not done right, we make it right. Calls are answered by a live person 24/7, so you’re never stuck leaving a voicemail and hoping. And our technicians are background-checked and arrive in uniform, which matters when someone is working inside your home.

A tile setter installing wall tile in a shower

When You Need Vanities, Tile & Fixtures

Most people don’t wake up and decide to redo a bathroom for fun. They call because something broke, something looks dated, or they’re selling and the bathroom is dragging the whole house down. Here are the situations we see most often in Berkeley.

  • The vanity is failing. Particleboard cabinets swell and delaminate in Berkeley’s damp, foggy winters, especially in bathrooms without a working exhaust fan. If the cabinet doors don’t close flush or the base is soft near the floor, replacement usually beats repair.
  • The tile is cracked, loose, or dated. Hairline cracks in floor tile usually mean the subfloor moved. In older homes around the Elmwood and North Berkeley flats, we regularly find tile laid directly over a thin mortar bed that’s started to fail after decades of settling.
  • The fixtures are original and worn. A faucet that drips, a shower valve that runs hot then cold, or a drain that’s slow to clear all point to fixtures past their service life. Old galvanized supply lines are often the underlying cause.
  • You’re remodeling for resale. Buyers look hard at bathrooms. A coordinated vanity, clean tile, and modern fixtures return more at sale than almost any other small project, and they photograph well.
  • Water damage behind the tile. Crumbly grout in the shower and a spongy feel behind the wall are warning signs of a failed waterproofing layer. That has to be fixed before new tile goes up, or the new tile will fail the same way.
  • Accessibility updates. A curbless shower, a comfort-height vanity, and grab-bar-ready blocking behind the tile make a bathroom safer for aging parents or anyone with mobility limits. We build the blocking in during the tear-out, so it’s there when you need it.

Our Vanities, Tile & Fixtures Process

We run this as one continuous job, not three disconnected visits. Here’s how it goes from first call to final walkthrough.

  1. Free estimate and design consult. We walk the bathroom, measure the existing layout, check the plumbing and electrical, and talk through materials. You’ll get an upfront price, and the number you see is the number you pay. No surprise line items later.
  2. Material selection. For vanities we work with trusted brand partners, and we’ll help you pick cabinets and counters that fit the rough-in and your budget. For glass and shower surrounds we regularly specify Mr-Glass and ViewLux, and for door and trim details we’ll bring in Therma-Tru where a bathroom door is part of the job. You choose quality, not just whatever’s on the shelf.
  3. Demo and rough-in. We pull the old vanity, tile, and fixtures, then inspect what’s behind them. If the subfloor is soft or a supply line is corroded, we show you before we fix it and price the change in writing.
  4. Waterproofing and tile. We install a proper waterproofing membrane in the shower and wet areas before any tile goes down. Setting tile is the easy part; keeping water out of the wall is the part that lasts. Grout lines, layout, and cuts are planned so the pattern reads cleanly across the room.
  5. Vanity and fixture install. The vanity goes in level and plumb, the counter is set and sealed, and fixtures are installed and tested. We check for leaks at every connection and confirm the shower valve holds temperature before we call it done.
  6. Final walkthrough. We walk the finished bathroom with you, point out what we did, and hand over care notes for the tile and fixtures. Everything is backed by the 730-Day Done Right Promise.

Most straightforward vanity-and-fixture swaps finish in a single visit. Full tile jobs take longer because of the waterproofing cure time and grout, and we’ll tell you the real timeline in the estimate, not a number designed to win the bid.

A new bay window with a cushioned seat

Vanities, Tile & Fixtures Pricing in Berkeley

Bathroom pricing in Berkeley runs higher than the national average, mostly because of older housing stock, tighter lots, and the cost of hauling debris through narrow drives and stairwells. Here are honest ranges we quote for this work, so you can budget before you call.

Item Typical range What drives the price
Vanity replacement (single sink, stock cabinet) $900 – $2,400 Cabinet size, counter material, whether plumbing needs to move
Custom or double vanity with stone top $2,500 – $6,500 Cabinet grade, counter slab, two sinks and rough-in changes
Floor tile (per square foot, installed) $9 – $22/sq ft Tile type, subfloor prep, pattern complexity
Shower wall tile with waterproofing (per square foot) $18 – $45/sq ft Membrane work, tile size, niche and bench details
Faucet and fixture replacement (each) $150 – $450 Brand, finish, whether the valve or supply lines are replaced
Shower valve replacement (behind the wall) $400 – $1,100 Access, valve type, whether tile has to be opened

Those are ranges, not quotes. The single biggest cost driver is whether plumbing has to move: a vanity swap where the drain stays put is far cheaper than one that has to relocate the supply and drain lines through a slab or old framing. Tile pattern is second. A simple running-bond layout costs less to install than a herringbone or large-format pattern that requires more cuts and a flatter substrate. In Berkeley’s older homes, subfloor condition is the wild card, and we check it before we quote the tile so it doesn’t become a surprise.

Every estimate is free, and it’s an upfront price: the number you see is the number you pay. To make a bigger bathroom project work financially, we offer 0% financing for 18 months and $1,000 off projects over $10,000. When you’re comparing bids, ask each contractor whether the waterproofing and subfloor prep is included, because that’s where low bids hide the gaps. Call (855) 471-4163 and we’ll put a real number in writing.

FAQs – Vanities, Tile & Fixtures

How much does a bathroom vanity and tile cost in Berkeley?

A single-sink vanity replacement in Berkeley typically runs $900 – $2,400 installed, and floor or shower tile adds roughly $9 – $45 per square foot depending on type and waterproofing. A combined vanity, tile, and fixture job usually lands between $5,000 and $14,000 for a standard full bathroom. The final number depends on whether plumbing moves and how much subfloor prep is needed. Call (855) 471-4163 for a free estimate; estimates are free and the price is upfront.

Can you install the vanity, tile, and fixtures in one project?

Yes, we do all of it as one coordinated job, which is cheaper and faster than hiring separate trades. Doing it together means the walls are opened once, the tile and cabinet are planned to line up, and the fixtures are matched to the vanity rather than bought piecemeal. A straightforward vanity-and-fixture swap can finish in a single visit; full tile work takes longer because of waterproofing and grout cure time. Call us to schedule a walkthrough.

How long does a tile and vanity install take?

A vanity and fixture swap usually takes one day, while a full floor-and-shower tile job typically takes four to seven working days depending on size and pattern. Most of that time is waterproofing and cure, not setting tile, and rushing it is how bathrooms fail. We’ll give you the real timeline in the estimate. Call (855) 471-4163 to get your project on the schedule.

Why does waterproofing matter as much as the tile I pick?

Because waterproofing is what keeps the tile from failing, and it’s the part you can’t see. Berkeley’s damp winters put steady moisture stress on bathroom walls, and tile laid without a proper membrane will let water into the framing and cause the same spongy walls and loose tile you’re replacing now. We install a membrane in every wet area before any tile goes up. Ask any contractor you compare whether it’s included. Call us to talk through your shower.

Why Berkeley Homeowners Call Groundwork

We’ve been in business since 2014 and proudly serve local communities across our markets, and we handle vanities, tile, and fixtures as part of our full scope from foundation to finish line. You get one contractor for the whole bathroom instead of juggling a tile guy, a plumber, and a cabinet installer who all blame each other. Our technicians are background-checked and arrive in uniform. Pricing is upfront with no surprises. And the 730-Day Done Right Promise backs the work in writing.

If you’re also planning bigger work, we cover the full range of home construction services and can fold the bathroom into a larger project. For this specific job, start with our Bathroom Remodeling service page, and when you’re ready, call and we’ll set a time to walk your bathroom.

Ready to get started? Call (855) 471-4163 for a free project estimate and design consult. We’ll answer live, walk your bathroom, and put a real number in writing. From foundation to finish line, built to last and backed in writing.

Written by the team at Groundwork Construction Co. of Berkeley, serving Berkeley.

Getting started with Groundwork in Berkeley

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Berkeley team

A local vetted partner works across Berkeley and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Berkeley? Licensed & insured · free written estimates
Call (855) 471-4163
Local Service Coverage

Request a Free Estimate in Berkeley

Tell us what you need - Groundwork Construction Co. of Berkeley responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Call Now - 24/7 Dispatch