A Groundwork company - serving Berkeley, CA
A new rear addition with a vaulted beamed ceiling and tall windows
New Detached ADU · Berkeley, CA

New Detached ADU in Berkeley - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Berkeley
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
A wood double vanity with two mirrors after a bathroom remodel
A new roof with clean valleys and new flashing
A new multi-panel patio door opening a kitchen to the patio
A new stained cedar privacy fence
A new paver patio with a seat wall and fire pit
A remodeled primary bathroom with a soaking tub and walk-in shower
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

What a New Detached ADU in Berkeley actually involves

A new detached ADU in Berkeley is a fully separate, self-contained dwelling built on your lot – its own foundation, its own kitchen and bath, its own entry – and it typically takes 10 to 16 months from first site walk to final inspection. Most Berkeley homeowners spend between $45,000 and $130,000 depending on size, site conditions, and finish level, with full builds running higher. Call (855) 471-4163 for a free on-site estimate and a written line-item quote.

Call (855) 471-4163

How we build a New Detached ADU in Berkeley, stage by stage

Detached ADU work is predictable if you sequence it right. Here’s the real order, with the decisions you’ll make along the way.

  • Site walk and feasibility, week 1. We measure the lot, check setbacks, and look at what’s underground before anything else. In Berkeley you’re often working around a mature oak, a slope, or a shared sewer lateral, and that first walk tells us whether your buildable footprint is 400 square feet or 750. You decide the rough size and whether to include a garage or storage bay.
  • Design and permit submission, weeks 2 to 8. Plan review in Berkeley is not fast, and it isn’t meant to be. We submit drawings, coordinate the green-building and seismic paperwork, and respond to plan-check comments. You lock in the floor plan and exterior materials here, since those are expensive to change after approval.
  • Site prep, foundation, and utilities, weeks 9 to 14. Excavation, grading, and the concrete foundation happen first, then rough plumbing and electrical stubs. On hillside lots this is where the real money lands. You choose utility routes and whether the ADU gets its own meter.
  • Framing, sheathing, and weather-tight, weeks 15 to 22. We frame, sheath, and close the building envelope before interior work starts. Shear-wall and anchor-bolt detailing gets inspected here, so this stage is where the seismic allowances show up. You confirm window brands and door swing.
  • Finishes, systems, and final inspection, weeks 23 to 40. Insulation, drywall, cabinetry, counters, fixtures, flooring, and paint. Then the final walkthrough and sign-off. You pick finishes up front so nothing stalls mid-build.
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The options you’ll choose between on a detached ADU

Almost every decision on a new detached ADU in Berkeley comes down to a trade-off. Here’s how to think about them.

  • Size. A one-bedroom around 500 square feet keeps cost down and works for a rental or aging parent. A two-bedroom at 750 to 1,000 square feet costs more but rents for more and holds resale better. Figure roughly what each square foot costs with us before you commit.
  • Foundation type. A slab-on-grade is the cheapest and simplest where the lot is flat. A raised or pier-and-beam foundation costs more but handles slope, protects against moisture, and lets you run utilities underneath.
  • Exterior cladding. James Hardie fiber-cement siding holds up to Berkeley’s fog and rain and resists fire better than wood. Stucco is classic and low-maintenance. Redwood or cedar looks right on a Craftsman lot but needs repainting every 5 to 7 years.
  • Windows and doors. Andersen and Pella give you real energy performance and a long warranty. Therma-Tru entry doors are a solid mid-tier choice with good weather sealing. For sliding and specialty glass, ViewLux and Mr-Glass work well where you want light without a huge frame.
  • Systems. Berkeley requires electric appliances in new low-rise buildings, so a heat-pump water heater and an induction range instead of gas. Ductless mini-splits handle heating and cooling efficiently.

What a New Detached ADU costs in Berkeley, CA

A remodeled family room with new windows and a window seat

Plan on $45,000 to $130,000 for a new detached ADU in Berkeley, with larger or hillside builds pushing toward $220,000. Here’s what moves the number:

Cost factor Typical range
Foundation and site prep $12,000 – $40,000
Framing and shell $18,000 – $45,000
Electrical, plumbing, HVAC $10,000 – $28,000
Kitchen and bath finishes $8,000 – $25,000
Permit and plan review $3,000 – $9,000

The four things that push a job to the high end: slope and soil conditions that require engineered retaining, relocating or upgrading utilities, premium finishes, and fire-resistant detailing required in the hills. A written estimate from us lists every line, and the number you see is the number you pay. Financing at 0% for 18 months and $1,000 off projects over $10,000 help on builds this size.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Berkeley homes specifically do to this job

Berkeley is where progressive building rules meet a century of old houses, and a new detached ADU has to satisfy both. You’re building next to structures that were often put up before 1940 – Craftsman bungalows in the Elmwood flatlands, brown-shingle Berkeley boxes in North Berkeley, hillside homes in the fire zone above the 1991 burn scar. Pull a permit and you may uncover original redwood framing that’s still strong but has to be brought up to current shear-wall and anchor-bolt standards, which can turn a small ADU project into a full seismic retrofit of the main house too. Berkeley was the first U.S. city to ban natural gas in new low-rise buildings, so your ADU will be all-electric, and the hills bring fire-resistant detailing requirements that the flats don’t. In the Elmwood and North Berkeley flatlands we regularly find century-old knob-and-tube wiring that has to be replaced before the ADU’s electrical can tie in safely.

Serving Berkeley, CA – Our Local Coverage Area

We serve Berkeley and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked: New Detached ADU in Berkeley

A framer checking new wall framing on a home addition

Get a free estimate for your New Detached ADU in Berkeley

A new detached ADU in Berkeley is a real investment, and you deserve straight numbers before you commit. We’ll walk your lot, talk through size and layout, and hand you a written line-item estimate – no pressure, no vague ranges. Financing at 0% for 18 months is available, plus $1,000 off projects over $10,000. Call (855) 471-4163 to schedule your free on-site estimate today.

Written by the team at Groundwork Construction Co.

Why Berkeley Chooses Groundwork Construction Co. of Berkeley

We set the standard for new detached ADU in Berkeley.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Berkeley

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Berkeley Customers Say

Trusted by homeowners across Berkeley and surrounding areas.

★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new curved paver walkway to the front porchA galley kitchen opened up to the dining room with a new peninsulaA walk-in shower with large-format tile and a built-in nicheA standing-seam metal roof over a covered porchA new bay window with a cushioned seatA new wood side gate with black hardware

More services in Berkeley

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Berkeley

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Berkeley team

A local vetted partner works across Berkeley and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in Berkeley?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Berkeley.

(855) 471-4163

Request a Free Estimate in Berkeley

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch