







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Moraga, CA: What to Expect and What It Costs
Replacing cabinets and countertops in Moraga typically takes two to four weeks from demolition to final caulk, and most homeowners here spend between $14,000 and $45,000 depending on whether they reface or replace, and how much of the kitchen gets touched. The countertop template alone is a two-visit process: one to measure after the boxes are set, one to install the stone. Call (855) 471-4163 and we’ll put a real number on your Moraga kitchen, not a ballpark.
How the job runs, stage by stage

Cabinet and countertop work has a rhythm. Skip a step and the counters won’t fit the boxes, or the boxes won’t fit the walls.
Stage 1 – On-site measure and layout (day 1). We photograph and measure every wall, check for out-of-square corners (common in 1960s and 1970s Moraga homes), and confirm appliance sizes. You decide cabinet line, door style, finish, and rough counter budget at this stage.
Stage 2 – Demo and prep (days 2-3). Old cabinets come out, drywall patches get made, and any electrical or plumbing rough-in that has to move gets flagged. If you’re keeping the sink and range where they are, this stage is fast. If a wall is coming out, add a week.
Stage 3 – Cabinet set (days 4-6). Base boxes get leveled and shimmed first, then uppers. Where a solid surface counter is going in, the cabinet installer leaves the tops off and calls for a field template. You confirm hardware placement now, because it’s drilled after the counter is on.
Stage 4 – Countertop template and fabricate (days 7-12). A templater traces the actual installed cabinets with a laser or physical template. Stone gets cut at the shop. This is the waiting stretch homeowners underestimate.
Stage 5 – Counter install and finish (days 13-17). Slab goes on, seams get epoxied, sink and faucet get set, backsplash and trim finish the edge. Final walkthrough happens the day we’re done.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The choices you’ll actually make
- Cabinet construction: Plywood boxes hold screws and survive a Moraga summer better than particleboard. Plywood adds cost but is the difference between cabinets that stay square and ones that sag.
- Door material: Painted MDF is smooth and takes paint well. Solid wood doors expand and contract with the valley’s heat. Thermofoil is the budget pick and can peel near a range or dishwasher.
- Counter surface: Quartz is non-porous and forgiving. Granite is a natural slab with more variation. Butcher block is warm but needs re-oiling. Laminate is the cost floor and reads as laminate.
- Reface vs. replace: Refacing keeps the existing boxes and swaps doors and veneer. It’s the lower-cost route but only works if the original boxes are solid and square.
- Edge profile and thickness: A standard eased edge is included in most quotes. A waterfall or mitered edge on an island adds fabrication time.
What Cabinets & Countertops costs in Moraga, CA

Cabinet installation runs $4,000 to $13,000. Countertop installation runs $2,000 to $6,500. Put them together with a little plumbing and electrical and you land in the $14,000 to $45,000 range for the full job.
What pushes a Moraga kitchen to the top of that range:
- Cabinet line and door style: a semi-custom KraftMaid run costs more than a stock line, but the fit tolerances are tighter.
- Stone grade: a slab with heavy veining or a rare color costs more than a standard quartz.
- Relocation: moving a sink, range, or refrigerator means new plumbing and a 240V circuit. That’s the single biggest adder.
- Layout changes: removing a wall or opening the kitchen to the dining room means a structural review.
- Permit scope: a like-for-like swap may not need one. A layout change does.
Every written estimate spells out what’s included: demolition, haul-away, cabinets, counter fabrication, install, and finish. What’s not included is spelled out too. That’s what upfront pricing, no surprises, means in practice.
See the difference
Before
After
Before
After
Before
AfterWhat Moraga homes specifically do to this job
Most of the kitchens we work on in Moraga sit inside 1960s through 1980s custom ranches and split-levels, and a fair number are newer luxury builds on the large hillside lots off Moraga Road and Sanders Ranch. Those older homes have original plumbing and electrical. When a cabinet swap turns into a relocation, the wall behind the old range is where the surprise lives. Large lots and sloped terrain mean additions are common, and a cabinetry change often pairs with a wider project, which is why many homeowners start with our Kitchen Remodeling in Moraga page before narrowing down to just the boxes and stone. Because the valley runs hotter than the nearby Oakland and Berkeley hills, cabinets near a window or range get real heat cycles. We spec doors and finishes with that in mind. When a job grows into adding living space, it also pairs naturally with a Garage Conversion ADU in Moraga or a New Detached ADU in Moraga, and we cover the full Moraga area on every one of those calls.
Serving Moraga, CA – Our Local Coverage Area
We serve Moraga and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Cabinets & Countertops in Moraga

Two to four weeks for most kitchens. Refacing is faster than a full replacement, and stone counters add about a week of fabrication time between template and install. Call (855) 471-4163 to schedule a free estimate and get a real timeline.
Like-for-like replacement typically doesn’t. Relocating plumbing, moving a wall, or adding a circuit does, and hillside properties may also need a topo survey or geotech review before permits issue. We pull permits as part of the job and walk you through inspection scheduling. Call us for a straightforward answer on your specific project.
Yes, and that’s the cleanest version of this job. Keeping the sink, range, and fridge where they are avoids the plumbing and electrical work that drives cost into the upper range. Most Moraga owners who stay in place spend closer to the low end. Call (855) 471-4163 to price a swap-in-place.
Refacing keeps the existing cabinet boxes and replaces doors and drawer fronts. It’s the lower-cost route and works if the boxes are square and solid. Replacement gives you new boxes, new hardware, and a layout you can adjust. Both are covered under our kitchen remodeling service if you want to widen the scope.
All cabinet and countertop work is covered by our 730-Day Done Right Promise. If something isn’t right, we come back and make it right. Stone and cabinet manufacturers also carry their own material warranties. Call (855) 471-4163 for the full written breakdown.
Get a real number for your Moraga kitchen
The free on-site estimate is the place to start. We walk the kitchen with you, measure the walls, and talk through cabinet line, counter material, and layout before a number gets written down. Need to widen the scope? Our Kitchen Remodeling service covers the full build. Call (855) 471-4163 to schedule. A live person answers around the clock.
Written by the team at Groundwork Construction Co.












