Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Pleasant Hill: What the Job Actually Involves
Cabinets & countertops in Pleasant Hill typically run $14,000 – $45,000 for a full tear-out and replacement, and most jobs take two to four weeks from demo to final caulk. You’ll spend roughly 2 – 4 days on demo and prep, another day on cabinet boxes and shimming, 1 – 3 days on the countertop template and install turnaround, then trim, backsplash, and punch list. Call (855) 471-4163 for a free on-site estimate with a written line-item price.
How We Run a Cabinet and Countertop Job, Stage by Stage

The sequence matters more than people expect. Get it out of order and you’re paying for rework.
Stage 1: Protect, demo, and reveal (days 1 – 3)
We mask the floors and adjoining rooms, shut off water and power to the affected circuits, then pull the old doors, boxes, and countertop. At this point the surprises show up. In Pleasant Hill’s 1950s – 1970s ranchers, that’s often galvanized supply lines, aluminum branch wiring, or a shallow slab under a sink cabinet. We photograph everything before we cover it, because your countertop fabricator needs accurate wall-to-wall measurements and the City needs a clean record if a permit is open. You decide here whether to upgrade anything behind the wall: a dedicated circuit for the new range, a relocated dishwasher line, under-cabinet lighting rough-in.
Stage 2: Rough-in and inspection (days 2 – 5)
If plumbing or electrical moves, it moves now, not after the boxes are set. We pull the permit before any of it starts, because Pleasant Hill inspection scheduling is the one thing you can’t compress. You review cabinet layout one final time, confirm that the sink is centered where you want it, and lock in filler panel sizes for out-of-square walls. Older ranch homes rarely have a straight wall; plan on fillers and scribing.
Stage 3: Cabinet installation (days 3 – 6)
Boxes go in level and plumb, anchored to studs, shimmed at the toe kick, with crown and light rail added at the top. Door and drawer fronts and hardware go on after everything is square. You’ll want to confirm drawer stack heights now: a 34-inch base is a different beast than a 36-inch with a deep top drawer, and once the boxes are set the decision is gone.
Stage 4: Template and countertop install (days 5 – 10)
One of our countertop partners templates the installed boxes directly, which is the only way to guarantee a snug fit against an un-square wall. Fabrication runs 3 – 7 business days for quartz, longer for natural stone out of a slab yard. Installation is a single day, typically 3 – 5 hours, with a dry-fit first. You choose edge profile (eased vs. bullnose vs. mitered) and seam placement before template, not after.
Stage 5: Trim, finish, and closeout (days 7 – 14)
Toe kick, end panels, crown, hardware, caulk lines, and a final walkthrough where we run hot water, test every drawer, and confirm the sealant has setup. We leave you the material spec sheets and inspection records in one folder. If a door is scratched or a shelf sags in month three, the 730-Day Done Right Promise covers it. If it’s not done right, we make it right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Actually Make, and What Each One Costs You Later
- Box construction: plywood vs. particleboard. Plywood holds up better in a kitchen with a dishwasher and sink nearby. Particleboard is cheaper and lighter but swells when it gets wet. For a Pleasant Hill ranch home where the kitchen sink is often against an exterior wall, plywood is worth the extra few hundred dollars per run.
- Door style and finish: painted MDF vs. solid wood vs. thermofoil. Painted MDF takes touch-ups easily; solid wood is repairable but costs more and shows grain; thermofoil is the cheapest and peels near heat sources over time. KraftMaid’s cabinets are a common upgrade for homeowners who plan to stay.
- Countertop material: quartz, granite, or solid surface. Quartz is non-porous and doesn’t need sealing; granite is cheaper in some slab yards and handles heat better; solid surface can be sanded and refinished but scratches. Cambria quartz is a popular move for homeowners who want a uniform look. We don’t push one over the other; we tell you what holds up with what you’re cooking.
- Cabinet-to-countertop ratio: upper run length vs. base run length. Longer upper runs mean more storage but less countertop. If you’re a baker, favor base and open shelving. If you cook Asian food with lots of small equipment, favor uppers. The layout is yours to decide; we try to talk you out of over-cluttering.
- Under-cabinet lighting and electrical. Adds $200 – $600 and is easy to add before install, miserable after. Talk about it at Stage 2.
- Edge and seam placement. A standard eased edge is included; a mitered edge with thick reveal runs $300 – $900 more. Seams in quartz should land on a natural break in the layout, not in the middle of a high-use counter.
What Cabinets & Countertops Costs in Pleasant Hill, CA

Full cabinet and countertop replacement in Pleasant Hill runs $14,000 – $45,000. Cabinet sets alone, installed, are $4,000 – $13,000; countertop fabrication and install is $2,000 – $6,500. These are the ranges we quote and the ranges we hold to under upfront pricing, no surprises.
What moves the number
- Cabinet count and square footage. A galley run of 10 linear feet of cabinets lands near $4,000 – $6,000 installed. A full L-shape with an island pushes $10,000 – $13,000.
- Existing condition. Original aluminum wiring or galvanized plumbing in a 1950s Pleasant Hill rancher means permit-triggered upgrades before sign-off. That’s $1,500 – $4,000 more, mostly in electrical and plumbing rough, and it’s the single most common surprise in this city.
- Relocating structure or plumbing. Moving a sink 3 feet costs a fraction of moving it 15 feet. Moving a gas range means a plumber and a permit; moving a load-bearing wall means framing and structural engineering.
- Material grade. Stock cabinets and laminate countertops sit at the low end. Semi-custom KraftMaid boxes with a quartz top land mid-range. Fully custom cabinetry with a slab of Cambria pushes the top end.
- Permit scope. Cosmetic replacement (same layout, same utilities) often doesn’t trigger a permit. Any plumbing, electrical, or structural move does, and the inspection schedule adds roughly a week. We pull permits and pass inspections on the work we perform.
What’s in a written estimate: demo and haul-away, cabinet boxes and fronts, countertop template and fabrication, install labor, shim and caulk, trim. What usually isn’t: new appliances, plumbing fixtures, backsplash tile if you’re adding one, and any structural framing. Those get separate line items, in writing. Call (855) 471-4163 for a free estimate with the exact number.
See the difference
Before
After
Before
After
Before
AfterWhat Pleasant Hill’s Housing Stock Does to This Job
Almost every home we work on in Pleasant Hill is a remodel, not new construction. The city is built out, and 94523 is mostly 1950s – 1970s single-story ranchers and split-levels, plus 1960s – 80s townhome clusters near downtown and the freeway. That means our crews are opening up walls that were last touched when aluminum wiring was standard and galvanized supply lines were normal. In Gregory Gardens and the downtown tracts, we often find shallow slabs under the sink cabinet, which changes how we anchor a new base cabinet run and where the dishwasher line can go. The clay soils on Pleasant Hill’s hillside slopes are also worth flagging: if the floor under the kitchen is out of level, we shim and note it before the boxes go in, and we don’t pretend a cabinet install solves a foundation problem. If your kitchen project is part of a full Kitchen Remodeling in Pleasant Hill, those issues get addressed together. And when the scope is larger, homeowners we work with often pair this with a Garage Conversion ADU in Pleasant Hill or a New Detached ADU in Pleasant Hill, both of which involve their own cabinet runs and permit scope. We cover the whole of Pleasant Hill and stop at the city line; the same crews don’t drift into Walnut Creek or Martinez and disappear.
Serving Pleasant Hill, CA – Our Local Coverage Area
We serve Pleasant Hill and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Cabinets & Countertops in Pleasant Hill

Two to four weeks for a full tear-out, longer if a permit inspection is scheduled or you choose natural stone that needs to be ordered from a slab yard. Demo and prep runs 2 – 4 days, cabinet install 1 – 3 days, and countertop fabrication 3 – 7 days. Call (855) 471-4163 and we’ll give you a realistic calendar before we start, not after.
No permit is required for cosmetic replacement that keeps the same layout and utilities. You do need one if plumbing, electrical, or structural work is involved, and if you have original aluminum wiring in an older ranch home, opening the wall can trigger a permit review. We pull permits and pass inspections on the work we perform. Call (855) 471-4163 with your address and we’ll tell you which category you’re in.
Yes, in most cases. If the sink, range, and dishwasher stay in the same rough positions, you can replace cabinets and countertops without opening a structural wall or moving a drain. We measure existing rough locations before demo and match the new boxes to them. Where it gets complicated is old drain traps or a floor that’s out of level, and we’ll flag those before you commit.
$14,000 – $45,000 for a full cabinet and countertop replacement, with the range set by cabinet count, material grade, and whether the existing wiring and plumbing need upgrades. A galley kitchen on a tight budget can land near $14,000; a full L-shape with an island and quartz can reach $45,000. Call (855) 471-4163 for an exact quote. Estimates are free.
Every job is covered by the 730-Day Done Right Promise, one of the longest workmanship guarantees in residential construction. If a door sags, a seam fails, or a filler panel comes loose in that window, we make it right. Our technicians have up to 12 years of experience, and calls are answered by a live person 24/7, so you’re not leaving voicemail on a weekend.
Get a Free On-Site Estimate for Cabinets & Countertops in Pleasant Hill
Book a free estimate and design consult and we’ll walk your kitchen, measure the existing boxes, and flag any wiring or plumbing that would change the scope. You’ll get a written line-item number, a calendar, and a live person on the phone at (855) 471-4163. There’s $1,000 off projects over $10,000, and 0% financing for 18 months is available. Call today.
Written by the team at Groundwork Construction Co.