







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Oakland, CA: What the Job Costs and How Long It Takes
New cabinets and countertops in Oakland typically run $14,000 – $45,000 for a full kitchen’s worth of cabinetry and stone, and the work itself takes two to four weeks from demo to final caulk. Cabinet installation alone lands at $4,000 – $13,000; countertop installation at $2,000 – $6,500. Call (855) 471-4163 for a free on-site estimate with a written line-item quote, fixed before a single box comes off the wall.
How We Sequence Cabinets & Countertops in Oakland, Step by Step

Cabinet and countertop work is a chain of dependencies, and the order matters more than the speed. Here’s how the sequence actually runs on an Oakland job, and what you’re deciding at each stage.
Stage 1: Measure, template, and lock the layout (days 1 – 3)
We measure the existing kitchen to the sixteenth of an inch, note where the walls are out of plumb (common in Oakland’s pre-war stock), and confirm the cabinet footprint against your appliances. You decide cabinet door style, finish, and box configuration here, because lead times of four to eight weeks start the day the order goes in. Any layout change that moves a sink, range, or outlet needs to be settled now, not after cabinets arrive.
Stage 2: Demo and prep (days 4 – 5)
Old cabinets, countertops, and backsplash come out. We check the wall behind them; in older Oakland homes this is where we find water damage from a slow leak, or knob-and-tube wiring that predates the kitchen and has to be brought up to current code before anything new goes back. You decide whether to repair or replace the subfloor and whether the wall finish gets patched or fully skimmed.
Stage 3: Cabinet install and leveling (days 6 – 8)
Base and wall cabinets go in, shimmed and scribed to the wall. Out-of-square walls in a Craftsman or Victorian bungalow mean filler strips and careful scribing; you won’t see a gap, but the install takes longer than it would in a tract home. You confirm hardware placement and drawer configuration before the doors go on.
Stage 4: Countertop template and fabrication (days 9 – 15)
Once the base cabinets are set, we template the countertop. Quartz and granite are cut to the exact template, which means the countertop can’t be ordered from a rough measurement; it has to follow the installed cabinets. You choose edge profile and sink cutout. Fabrication takes about a week for most quartz slabs.
Stage 5: Countertop set, sink, and final walkthrough (days 16 – 18)
The countertop goes down, the sink and faucet get set, and we do a full walkthrough with you: doors aligned, drawers gliding, seams tight. Anything that isn’t right gets fixed before we call the job done, and it stays covered under our 730-Day Done Right Promise.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Cabinets & Countertop Options You’ll Choose Between
Half the decisions on this job come down to materials, and the trade-offs are real. Here’s what we walk Oakland homeowners through:
- Stock vs. semi-custom vs. custom cabinets. Stock cabinets are the cheapest and fastest but come in fixed sizes, which means filler strips and lost inches in an old, out-of-square kitchen. Semi-custom (KraftMaid is a brand we work with) lets you adjust width and depth to fit the room, and that flexibility is usually worth the cost in a pre-war home. Full custom is for unusual layouts or specific design requirements.
- Quartz vs. granite vs. butcher block. Quartz is non-porous and low-maintenance, which suits a busy household. Granite is natural stone with variation no two slabs share, but it needs sealing. Butcher block is warm and repairable but needs oiling and doesn’t love a wet sink area.
- Cabinet box material and finish. Plywood boxes hold up to moisture and weight better than particleboard. Painted finishes show wear; thermofoil and laminate are durable but harder to repair if chipped.
- Hardware and soft-close. Soft-close hinges and full-extension drawer slides are a small line item with a big daily-payoff. Decide now, because retrofitting later means new hardware and new holes.
What Cabinets & Countertops Cost in Oakland, CA

A full kitchen’s worth of cabinets and countertops in Oakland runs $14,000 – $45,000. Cabinet installation alone is $4,000 – $13,000, countertop installation is $2,000 – $6,500, and if you’re adding an island expect $3,000 – $10,000 more. A backsplash adds $800 – $2,500. Here’s what moves a job to the low or high end:
- Kitchen size and cabinet count. A small galley lands near the bottom; a large kitchen with an island and pantry pushes toward the top.
- Existing condition. Water damage, out-of-square walls, or old wiring that has to be brought up to code adds labor before cabinets go in.
- Relocating plumbing or electrical. Moving a sink or range means new supply, drain, and circuits, and that’s the single biggest jump in scope.
- Material grade. Stock cabinets and laminate counters sit at the low end; semi-custom cabinetry with quartz tops sits at the high end.
- Permit scope. A straight cabinet and countertop swap often needs no permit. Anything that moves plumbing, electrical, or walls does.
Your written estimate lists every line item: cabinets, countertop fabrication, demo, install labor, and disposal. It doesn’t include appliances, unexpected structural repairs, or a change to the layout after the order is placed. Upfront pricing means the number you see is the number you pay for the scope in writing.
See the difference
Before
After
Before
After
Before
AfterWhat Oakland Homes Specifically Do to a Cabinet and Countertop Job
Oakland’s housing stock is the story here. In the 1900s – 1920s Craftsman and Victorian bungalows of West Oakland (94607/94601) and Fruitvale, kitchens were built small and walls were never plumb. Installing cabinets means scribing to those walls and often finding knob-and-tube wiring or aging galvanized plumbing behind the old boxes, which has to be addressed before the new cabinets go in. In the Oakland Hills (94611/94619), we routinely work on post-1991-fire rebuilds with deep foundations and fire-resistant details, and on hillside lots where access is narrow enough that material delivery has to be planned around it. The flats east of the hills (94621) are mostly midcentury tract homes where the cabinet footprint is more predictable but the parts are older. If the wider project is in scope, this often sits inside Kitchen Remodeling in Oakland, and homeowners sometimes pair it with a Garage Conversion ADU in Oakland or a New Detached ADU in Oakland that needs its own kitchenette. We cover all of Oakland, and if you’re looking beyond cabinets, see our Kitchen Remodeling service.
Serving Oakland, CA – Our Local Coverage Area
We serve Oakland and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Cabinets & Countertops in Oakland

Two to four weeks from demo to final walkthrough, depending on material lead time and whether any wiring or plumbing needs to be brought up to code. Call (855) 471-4163 for a firm timeline on your kitchen.
A straight swap usually needs no permit. Moving plumbing, electrical, or a wall does, and that scope triggers inspection. We’ll tell you upfront which side your job falls on and pull the permit if it’s required.
Yes, and that’s the most common path. If the sink and range stay put, we can often keep the existing supply and drain lines and save you the cost and inspection of relocating them.
Expect $14,000 – $45,000 for a full kitchen’s worth of cabinets and countertops. Cabinet installation is $4,000 – $13,000; countertop installation is $2,000 – $6,500. Call (855) 471-4163 for an exact quote, free on-site.
Every cabinet and countertop job is covered by our 730-Day Done Right Promise, one of the longest workmanship guarantees in residential construction. If it’s not done right, we make it right.
Get a Free Estimate on Cabinets & Countertops in Oakland
Call (855) 471-4163 to schedule a free on-site estimate for cabinets and countertops in Oakland. We’ll measure the kitchen, walk through cabinet and countertop options with you, and hand you a written line-item quote with the scope fixed before work starts. A live person answers around the clock, and projects over $10,000 get $1,000 off plus 0% financing for 18 months.
Written by the team at Groundwork Construction Co.












